Track Functional Group

Technical Committee 1 – Roadway & Ballast

This committee is responsible for the development and publication of recommended practices and information relating to:

  • Preliminary exploration, testing, design, construction, and maintenance of railway roadbeds. This shall include soil stabilization, retaining structures and drainage.
  • Ballast types and sections.
  • Culvert types, installation and inspection.
  • Utility installation on railway rights-of-way by railways or others.
  • Fencing and roadway signs.
  • Vegetation control.
  • Tunnel design and excavation, not including lining the tunnel, which is the responsibility of Committee 8.
  • Geosynthetic materials for railway applications.

Chair

Eric J. Frostestad, PE

Sr Railroad Project Engineer

HDR

Email: [email protected]

Vice Chair

Shawn R. Coombs, PE

Federal Engineering Manager

Advanced Drainage Systems, Inc.

Email: [email protected]

Secretary

Felicia Morgan, PE

Manager Track Design

BNSF Railway

Email: [email protected]

Subcommittees and Current Assignments

Subcommittee A: Recommendations for Further Investigation and Research.

Subcommittee B: Revision of Manual.

Subcommittee 1: Roadbed

D1-1-17: Rewrite of Section 1.4.1 - Maintenance of Roadbed 

D1-2-17: Rewrite of Section 1.4.2 - Maintenance of Rock Slopes

D1-2-18: Rewrite of Section 1.4.3 – Maintenance of Earth Slopes

D1-3-18: Rewrite of Section 1.4.4 – Widening of Cuts 

D1-1-20: Develop Section 1.4.7 Methods of Sand Removal

D1-1-24 Incorporate the content of Chapter 16 Sections 10.2.2.6, 10.3.2, 10.3.3, and 10.3.4 in Chapter 1 Section 2 of the Manual

D1-1-25 Revise Article 1.2.2.6.5 - Blasting

Subcommittee 2: Ballast

D2-1-11: Re-cycled Crushed Concrete for Sub-ballast application

D2-3-17: Rewrite of Section 2.11 Sub-ballast Recommended Practice

D2-4-18: Develop recommendations for ballast electrical resistivity

D2-7-18: Develop recommendations for ballast electrical resistivity

D2-2-24: Add Section 2.10 to Chapter 1 to provide guidance on ballast surfacing

D2-1-25 Create new section for High-Speed Rail, suggest working with Committee 17, 8

Subcommittee 3: Natural Waterways

D3-8-18: Revise and combine Sections 3.4, 3.5, and 3.6

D3-3-20: Re-write of Section 3.2

D3-1-24 Add Section 3.1.3: Hydrologic and Hydraulic Design Criteria Guidelines

D3-1-25 Rename Part 3 – “Natural Waterways” to “Hydrology and Hydraulics”

Subcommittee 4: Culverts

D4-4-17: Rewrite of Section 4.18 Earth Boring and Jacking Culvert Pipe Through Fills 

D4-7-17: Rewrite of Section 4.1 – Location and Type 

D4-8-17: Rewrite of Section 4.11 – Hydraulics of Culverts 

D4-9-17: Rewrite of Section 4.19 – Culvert Rehabilitation 

D4-10-17: Rewrite of Section 4.20 – Specifications for Steel Tunnel Liner Plates 

D4-11-17: Rewrite of Section 4.21 – Construction of Tunnel Using Steel Tunnel Liner Plates

D4-1-18: Rewrite of Section 4.22 Culvert Inspection

D4-4-20: Re-write of Section 4.18 Culvert End Treatments

D4-1-23: Request to update 4.4, 4.5, 4.8, 4.9, 4.25, and 4.26

D4-1-24: Assignment to review terminology that may create liability concerns, e.g. Must vs Should

D4-2-24: Update Part 4 References

D4-3-24: Add parameter for minimum cover over culvert

D4-1-25 Assignment to harmonize underdrain details and guidance in Parts 1, 4, and 10

 

Subcommittee 5: Utilities

D5-5-18: Develop manual material regarding monitoring of track during construction

D5-6-18: Develop recommended practice for pipe ramming & jacking 

D5-9-18: Reorganize sections of the manual (5.7 & 5.8) dealing with trenchless technologies to make it easier for the user to understand

D5-10-18: Review and revise manual content regarding depth of cover for utilities

D5-5-20: Reorganize entire Part 5

D5-1-24: Create pipe hammering section

D5-2-24: Update auger boring section

D5-1-25 Assignment for reviewing Part 5 for needed updates, have a list of updates for this section

Subcommittee 6: Fences

D6-1-24 Rewrite Part 6 and update photos

Subcommittee 7: Roadway Signs

D7-5-17: Reestablish the subcommittee and develop new content for this section of the manual which would be simplified material for use primarily by short line railroads and public agencies

D7-11-18: Update graphic appendix for Part 7 (Roadway Signs)

Subcommittee 8: Tunnels

D8-3-16: Develop recommendations for Pilot Tube Method of Micro-tunneling

D8-1-24 Incorporate Ch. 16 Section 10.9 – Tunnels into Ch. 1, Part 8 – Tunnels

Subcommittee 9: Vegetation Control

None

Subcommittee 10: Geosynthetics

C10-1-96: Develop recommended practice for the use of geosynthetics for stabilization of the track roadbed. Monitor applicable research on goesynthetics for information that will strengthen AREMA specifications. Continuing assignment.

D10-2-14: Create Section 10.0 Introduction to Geosynthetics

D10-2-15: Develop recommendations for use of woven geotextile fabrics

D10-6-20: Update of Section 10.1, 10.2 and 10.3

D10-1-21 Develop a section on permanent erosion control

D10-1-25 Assignment to rewrite 10.1.03